Office Fit Out Design, Wadhurst

With stringent limitations being imposed to comply with the requirements of SBEM, natural ventilation and sustainable and energy efficient elements were incorporated into the design package to provide a low carbon solution. The building boasts a glazed reception foyer, office accommodation including a low energy lighting scheme, gymnasium, changing and hospitality areas, all supported by free hot water and heat pump technologies.

Project Manager: Blue Ridge Designs Ltd
Architect: Blue Ridge Designs Ltd
Cost Consultant:
Main Contractor: Baxall Construction Ltd